Friday, 16 August 2013

THE EFFECT OF CONTROL MEASURE ON QUALITY PRODUCTS IN SYSTEM METAL COMPANY LIMITED, CALABAR


ABSTRACT
The study investigated the effect of control measure on the quality products in System Metal Company Limited, Calabar. The survey design was adopted in the gathering data for this study. Data were collected from both primary and secondary sources. This was from questionnaire and personal interviews and the secondary data were gotten from journals, textbooks, Internet, etc. in the course of carrying out this study, three hypotheses were formulated and tested to verify the validity of data collected. And the findings obtained in the course of carrying out this discovered that effective control measures can significantly affect the quality of product in System Metal Company Limited, Calabar. It was also revealed that lack of training of production staff can lead to poor product quality. Sequel to these findings, recommendations was made; the organization should ensure that effective control of product quality is being established in the most efficient manner in order to facilitate increased customer's loyalty and high level of returns on investment.


                                         CHAPTER ONE 
INTRODUCTION
1.1   Background to the study
        Monitoring performance and comparing actual performance with pre-determined standard is one of the managerial tools in an organization. Managerial control is effective when standards are established for the variables that are to be controlled, when information is available to measure the established standards, and when managers can take corrective action whenever the variable deviates from it desired state or standard. 
         Standards are the criteria against which future, current or past actions are compared. They are measured in a variety of ways including physical, monetary, quantitative and qualitative terms. Managers must provide information that report actual performance against standards. Such information is most easily acquired for activities that produce specific and concrete result.
         Every business today wants to have quality products and services that are better than average, perform to the level needed, and are affordable. Effective control therefore, involves the implementation of methods that provides answers to the three basic questions: what are the planned and expected results? By what means can actual result be compared to planned result? What corrective action is appropriate?

1.2   Statement of the problem      
         Increased attention has been paid to effective control measures as an important determinant of the quality of products or services in any organization. For the set of goals and objectives of any establishment to be attained, an adequate quality control measure must be put in place. Most organizations have failed to realize this fact, and because of this, they have faulted in their operation. 
         In the course of carrying out this study, it was discovered that most organizations have failed to realize that appropriate control measure is not just to identify or flay those factors that could directly affect the quality of goods and services, but also to maintain an environment in which all employees are empowered to participate as a team in determining, assuring, measuring and improving the quality of products; lack of adequate profit due to increased cost without a proportionate increase in sales; lack of competent quality control personnel; the inability of project managers and project teams to inspect the accomplished works to ensure its alignment with the project and also the inability of the organization to inculcate budgeting as a basic technique for effective control often resulted or believed to have hindered the availability of quality products in an organisation.
         Based on these, the researcher became interested in conducting a research work on the effect of control measures ion the quality of products in System Metal Company Limited, Calabar.                       
 
NOT COMPLETE. PLEASE PAY FOR THE COMPLETE VERSION

THE COMPLETE PROJECT IS CHAPTER 1-5 #4,000 ONLY

PAYMENT PROCEDURE;

BANK: FIRST BANK

ACCOUNT NAME: EGBE JOHN EDOGI

ACCOUNT NO: 3034851408

GTBANK
ACCOUNT NAME: EGBE JOHN EDOGI
ACCOUNT NO: 0122005571

PLEASE AFTER PAYMENT SEND THE TELLER NUMBER AND YOUR NAME THE WAY IT APPEAR IN THE TELLER TO ANY OF THE FOLLOWING PHONE NUMBER:

08037940241
08183133884


       

No comments:

Post a Comment